Land Resumption Surveys for Rail Corridor
The Northern Missing Link project was constructed by Leightons Coal Connect for QR National. Vision Surveys (Qld) was employed by Leightons Coal Connect to assist with the initial primary control surveys, ground truthing surveys and engineering surveys required for the railway line construction.
QR National subsequently engaged Vision Consulting (Qld) to perform the boundary resumption surveys for registration with the Department of Natural Resources and Mines for titling.
During this process company director Brian Forrester has developed a strong relationship with the DNRM Senior Surveyors and Solicitors in regard to Leasehold and Freehold requirements for land resumption surveys.