Northern Missing Link Engineering and Cadastral Surveys
The Northern Missing Link project was constructed by Leightons Coal Connect for QR National.
Vision Surveys (Qld) provided initial primary control surveys, ground truthing surveys and engineering surveys required for the railway line construction.
Vision Consulting (Qld) performed the boundary resumption surveys for registration with the Department of Environment and Resources Management for titling.